The last week has been spent cranking out as many quilts as I could through the quilting machine so I could get caught up with the quilts that were waiting for quilting. With a concentrated effort over the last few weeks, I managed to get 9 quilts through the machine and they are now waiting on binding. That will be on my to do list for the next few weeks.
The quilt with the purple center star has been waiting a very long time to get it’s turn at the quilting machine.
I really like the fabric in this quilt, it was a gift from a friend for our charity.
In between cranking out quilts, I continued to work on Bonnie Hunter’s En Provence quilt so it does not get left behind and become a UFO. I have all of the tri-rec triangles finished in the purple and magenta, I have about half of the 4 patches in purple completed and all of the half-square triangles completed. I still need all of the quarter square triangles and the neutral 4 patches.
That is what I have been up to lately. To see what others have been up to go to Jo’s Country Junction.
Happy quilting!
Terry
Great job getting all those quilts quilted. That’s a ton of work.
LikeLike
That’s quite a pile of quilts. You did really well over your break. The binding takes time, but it never strikes me as the limiting step. Congrats on so much progress.
LikeLike